No. 64: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Creation of Notice No.64 page)
 
(More information on Notice 64)
Line 3: Line 3:
[http://www.s-r-s.org.uk/archivesignals/brwr.php External link to Notice No. 64]
[http://www.s-r-s.org.uk/archivesignals/brwr.php External link to Notice No. 64]


This notice describes the first stage of the opening of Swindon "B" SCC. Three signals controlled by Swindon PSB in the [[Uffington Interlocking]] area are replaced/re-sited and transferred to SB, specifically [[UM.65]] (SB.1014), [[DM.63]] (SB.107), and [[DM.64]] (SB.1011, moved to approx. 64m 51ch). In the Reading PSB area, UM.63 becomes SB.1010.
This notice describes the first stage of the opening of Swindon "B" SCC. Three signals controlled by Swindon PSB in the [[Uffington]] Interlocking area are replaced and transferred to SB, specifically [[UM.65]] (SB.1014, approx. 65m 66ch), [[DM.63]] (4-aspect SB.1007, approx. 63m 50ch), and [[DM.64]] (4-aspect SB.1011, approx. 64m 51ch). In the Reading PSB area, UM.63 is replaced by SB.1010 (approx. 63m 50ch).


[[Challow]] Down Relief is opened, and changes occur to the reversible signalling for running Up the Down Main. Two new signals are introduced, SB.1008R (co-located with UM.65/SB.1014) and SB.1008 (co-located with UM.63/SB.1010), and [[SN.91]], [[SN.93]] and [[SN.693]] now route to these signals, replacing the routes to R.703/R.703R.
[[Challow]] Down Relief is opened, and changes occur to the reversible signalling for running Up the Down Main. Two new signals are introduced, SB.1008R (co-located with SB.1014 at approx. 65m 66ch) and SB.1008 (co-located with SB.1010 at approx. 63m 50ch), and [[SN.91]], [[SN.93]] and [[SN.693]] are given routes to these signals, replacing the routes to R.703/R.703R.


[[SN.610R]] is re-sited to approx. 64m 51ch, and a new signal, [[SN.610RR]], is introduced at approx. 63m 50ch.
[[SN.610R]] is re-sited to approx. 64m 51ch (co-located with SB.1011), and a new signal, [[SN.610RR]], is introduced at approx. 63m 50ch (co-located with SB.1007).
 
[[SN.89]] and [[SN.10]] are replaced with 4-aspect signals. The YY aspect on [[SN.89]] does not appear to have ever been used. (Does Uffington-[[Bourton]] get resignalled to 4-aspect before or after this date?)

Revision as of 11:21, 9 June 2014

Back to list of Sources - Signalling Notices.

External link to Notice No. 64

This notice describes the first stage of the opening of Swindon "B" SCC. Three signals controlled by Swindon PSB in the Uffington Interlocking area are replaced and transferred to SB, specifically UM.65 (SB.1014, approx. 65m 66ch), DM.63 (4-aspect SB.1007, approx. 63m 50ch), and DM.64 (4-aspect SB.1011, approx. 64m 51ch). In the Reading PSB area, UM.63 is replaced by SB.1010 (approx. 63m 50ch).

Challow Down Relief is opened, and changes occur to the reversible signalling for running Up the Down Main. Two new signals are introduced, SB.1008R (co-located with SB.1014 at approx. 65m 66ch) and SB.1008 (co-located with SB.1010 at approx. 63m 50ch), and SN.91, SN.93 and SN.693 are given routes to these signals, replacing the routes to R.703/R.703R.

SN.610R is re-sited to approx. 64m 51ch (co-located with SB.1011), and a new signal, SN.610RR, is introduced at approx. 63m 50ch (co-located with SB.1007).

SN.89 and SN.10 are replaced with 4-aspect signals. The YY aspect on SN.89 does not appear to have ever been used. (Does Uffington-Bourton get resignalled to 4-aspect before or after this date?)