Ashbury
Jump to navigation
Jump to search
Signal Box
The mechanical signal box at Ashbury was taken out of use under Swindon MAS Stage 1, 12 November 1966[1].
Ground Frame
The crossovers remained controlled from Ashbury Ground Frame at the time of Swindon MAS Stage 1.
The up siding was controlled from a new ground frame, Ashbury Up Siding Ground Frame, installed at Swindon MAS Stage 1.
The protecting signals were semi-automatic, UM.71 and DM.70.
Level Crossing
The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].
The AHBs were commissioned...... when?
The crossing was closed with the raising of the line speed at the time of the introduction of HST.