359

From Swindon Panel Reference
Revision as of 22:40, 15 November 2014 by Danny (talk | contribs)
Jump to navigation Jump to search

Back to Control Functions

Relaying and Removal of Spur

The connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur.

1975-04.png

Removal

The connection was shown as being taken out of use altogether in July 1987:

1987-02.png

The connection was shown as being taken out of use AGAIN in November 1992:

1992-03.png