359

From Swindon Panel Reference
Jump to navigation Jump to search

Back to Control Functions

Relaying and Removal of Spur

The connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur.

1975-04.png

Removal

The connection was shown as being taken out of use altogether in July 1987:

1987-02.png

The connection was shown as being recovered in November 1992. Did it really sit out of use for 5 years?

1992-03.png