SN.225

From Swindon Panel Reference
Revision as of 21:32, 15 November 2014 by Danny (talk | contribs)
Jump to navigation Jump to search

Back to Control Functions

Relaying and Removal of Spur

359 connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur at this time.

1975-04.png

Removal

The signal was taken out of use when the connection (359 points) was taken out of use in July 1987:

1987-02.png