SN.72R

From Swindon Panel Reference
Revision as of 16:28, 9 November 2014 by Danny (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions

SN.72R became SN.70 at some point after 1975.

(Source: WON for remodelling of Thingley Junction)


Repositioning

The signal was moved 50 yards towards Bristol in connection with the slewing of the Down Main from the original down platform at Chippenham to the island platform.

1976-03.png