SN.11
Jump to navigation
Jump to search
Back to Control Functions
AWS Fitment
The signal was fitted with an AWS ramp in October 1971.
Conversion to 3-Aspect
The signal was converted to a 3-aspect in February 1975 in connection with the remodelling of Thingley Junction.