346

From Swindon Panel Reference
Revision as of 22:34, 24 August 2014 by Danny (talk | contribs) (Created)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions.

Description

346 points are the trailing connection in the Down Goods from the Down Through Siding at Swindon West.

They were worked by Down Sidings Ground Frame, released from Swindon Panel.

The ground frame was mechanical throughout its life.

Removal

The points were removed, after a long period of disuse, from 05.15 on Monday 12 December 2011:

WON-2011-01.png