346
Jump to navigation
Jump to search
Back to Control Functions.
Description
346 points are the trailing connection in the Down Goods from the Down Through Siding at Swindon West.
They were worked by Down Sidings Ground Frame, released from Swindon Panel.
The ground frame was mechanical throughout its life.
Removal
The points were removed, after a long period of disuse, from 05.15 on Monday 12 December 2011: