User contributions for Danny
Jump to navigation
Jump to search
15 November 2014
- 14:5114:51, 15 November 2014 diff hist +340 Rushey Platt Ground Frame No edit summary
- 14:4814:48, 15 November 2014 diff hist +733 N SN.62B Created page with "Back to Control Functions ==Origin== SN.62A and SN.62B were a set of splitting banner repeater signals on the Down Main between SN.60 and SN.62, applying to ..." current
- 14:4714:47, 15 November 2014 diff hist +338 SN.60 No edit summary current
- 14:4614:46, 15 November 2014 diff hist +733 N SN.62A Created page with "Back to Control Functions ==Origin== SN.62A and SN.62B were a set of splitting banner repeater signals on the Down Main between SN.60 and SN.62, applying to ..." current
- 14:4314:43, 15 November 2014 diff hist +208 DM.81 No edit summary
- 14:4214:42, 15 November 2014 diff hist −77 SN.205 No edit summary current
- 14:4214:42, 15 November 2014 diff hist −77 SN.62 No edit summary
- 14:4214:42, 15 November 2014 diff hist −77 DM.81 No edit summary
- 14:4214:42, 15 November 2014 diff hist −77 SN.60 No edit summary
- 14:4214:42, 15 November 2014 diff hist −77 DM.LOS (Wootton Bassett) No edit summary current
- 14:4014:40, 15 November 2014 diff hist +107 SN.42 →Alterations
- 14:3814:38, 15 November 2014 diff hist +2 Ground Frames No edit summary
- 14:3814:38, 15 November 2014 diff hist −1 Chippenham East Ground Frame →Removal
- 14:3714:37, 15 November 2014 diff hist +137 Chippenham East Ground Frame No edit summary
- 14:3214:32, 15 November 2014 diff hist +228 Wootton Bassett No edit summary
- 14:3214:32, 15 November 2014 diff hist +40 401 No edit summary current
- 14:3114:31, 15 November 2014 diff hist +213 N SN.145 Created page with "Back to Control Functions ==Origin== ... ==Movement== This signal was re-positioned 68 yards closer to Swindon in December 1978: border [[401..." current
- 14:3114:31, 15 November 2014 diff hist +164 N 401 Created page with "Back to Control Functions ==Origin== ... ==Movement== These points were re-laid 50 yards closer to Swindon in December 1978: border"
- 14:3014:30, 15 November 2014 diff hist +4 Wootton Bassett Goods Ground Frame No edit summary current
- 14:2914:29, 15 November 2014 diff hist +192 N Wootton Bassett Goods Ground Frame Created page with "Back to Control Functions ==Origin== ... ==Taking out of use== The ground frame was taken out of use in November 1978, as referred to in this WON entry: [[File: 1978-..."
- 14:2914:29, 15 November 2014 diff hist +55 31/W/2747 No edit summary current
- 14:2814:28, 15 November 2014 diff hist +182 31/W/2747 No edit summary
- 14:2714:27, 15 November 2014 diff hist +174 N SN.278 Created page with "Back to Control Functions ==Origin== ... ==Removal== The signal was moved in June 1978, as referred to (incorrectly) in 31/W/2747. border"
- 14:2514:25, 15 November 2014 diff hist +272 Rushey Platt Ground Frame →1976
- 14:2314:23, 15 November 2014 diff hist +165 N UG.LOS Created page with "Back to Control Functions ==Origin== ... ==Removal== The signal was brought into use in June 1978. It replaced GPL SN.276 border"
- 14:2214:22, 15 November 2014 diff hist +175 N SN.276 Created page with "Back to Control Functions ==Origin== ... ==Removal== The signal was taken out of use in June 1978. It was replaced by an LOS border" current
- 14:1414:14, 15 November 2014 diff hist +141 Thingley No edit summary
- 14:1314:13, 15 November 2014 diff hist +7 31/W/2739 No edit summary current
- 14:1314:13, 15 November 2014 diff hist +48 31/W/2739 No edit summary
- 14:1214:12, 15 November 2014 diff hist +302 N SN.205 Created page with "Back to Control Functions ==Origin== ... ==Alterations== The signal was altered in December 1977, at the same time as Wootton Bassett was fitted with flashing yellow a..."
- 14:1114:11, 15 November 2014 diff hist +315 DM.LOS (Wootton Bassett) No edit summary
- 14:1014:10, 15 November 2014 diff hist +299 N SN.62 Created page with "Back to Control Functions ==Origin== ... ==Movement== The signal was moved further in rear of the junction in December 1977, at the same time as Wootton Bassett was fi..."
- 14:1014:10, 15 November 2014 diff hist +367 N DM.81 Created page with "Back to Control Functions ==Origin== The signal was brought into use in December 1977, at the same time as Wootton Bassett was fitted with flashing yellow aspects. [The..."
- 14:0914:09, 15 November 2014 diff hist +395 N SN.60 Created page with "Back to Control Functions ==Origin== ... ==Replacement== The signal was taken out of use in December 1977, at the same time as Wootton Bassett was fitted with flashing..."
- 14:0814:08, 15 November 2014 diff hist −10 SN.211 No edit summary current
- 14:0714:07, 15 November 2014 diff hist +104 SN.211 No edit summary
- 14:0614:06, 15 November 2014 diff hist +425 N SN.653 Created page with "Back to Control Functions ==Origin== The signal was brought into use over the weekend 3-5 May 1977, replacing ground position light signal SN.209 as part of the prep..." current
- 14:0514:05, 15 November 2014 diff hist +260 N SN.209 Created page with "Back to Control Functions ==Origin== ... ==Replacement== Over the weekend 3-5 May 1977 the signal was replaced by new main aspect signal SN.653 as part of the prep..." current
- 14:0314:03, 15 November 2014 diff hist +184 Rushey Platt Ground Frame →1976
- 14:0014:00, 15 November 2014 diff hist +304 DM.80 No edit summary current
- 13:5913:59, 15 November 2014 diff hist +1 WON Entries →1970s
- 13:5813:58, 15 November 2014 diff hist +83 SN.50 →Alterations
- 13:4913:49, 15 November 2014 diff hist +101 DM.79 →Alterations
- 13:4813:48, 15 November 2014 diff hist +400 N DM.79 Created page with "Back to Control Functions ==Origin== ... ==Alterations== Over the weekend 3-5 May 1977 the signal was moved as part of the re-spacing of signals between Swindon and Wo..."
- 13:4613:46, 15 November 2014 diff hist +291 N SN.50 Created page with "Back to Control Functions ==Origin== ... ==Alterations== Over the weekend 3-5 May 1977 the signal was moved as part of the re-spacing of signals between Swindon and Wo..."
- 13:2513:25, 15 November 2014 diff hist +31 UM.79 No edit summary
- 13:2413:24, 15 November 2014 diff hist +31 SN.53 No edit summary
- 13:2413:24, 15 November 2014 diff hist +387 N UM.79 Created page with "Back to Control Functions ==Origin== ... ==Alterations in connection with Reversible Signalling== From 6 November 1977 the signal was mounted on a new gantry, in readi..."
- 13:2413:24, 15 November 2014 diff hist +366 N SN.53 Created page with "Back to Control Functions ==Alterations in connection with Reversible Signalling== From 6 November 1977 the signal was mounted on a right-hand cantilever, in readiness f..."
- 13:2113:21, 15 November 2014 diff hist +399 SN.89 →Alterations in connection with Reversible Signalling