Ashbury

From Swindon Panel Reference
Revision as of 20:21, 25 November 2014 by Danny (talk | contribs) (→‎Level Crossing)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Signal Box

The mechanical signal box at Ashbury was taken out of use under Swindon MAS Stage 1, 12 November 1966[1].

Ground Frame

The crossovers remained controlled from Ashbury Ground Frame at the time of Swindon MAS Stage 1, released from Uffington SB.

The up siding was controlled from a new ground frame, Ashbury Up Siding Ground Frame, installed at Swindon MAS Stage 1 and released from Uffington SB.

The protecting signals were semi-automatic, UM.71 and DM.70.

See the pages about the individual GFs linked above for more details.

Level Crossing

The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].

The AHBs were commissioned by March 1968 (S.2546).

Closure

The crossing was closed in May 1977 in connection with the raising of the line speed at the time of the introduction of the HST as described in the WON item below and in signalling notice 31/W.2736.

1977-04.png

References

  1. 1.0 1.1 S.2498