Chippenham: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
[[File: 1976-03.png | border]] | [[File: 1976-03.png | border]] | ||
==Conversion of Melksham Line to TCB== | |||
Bradford Junction box closed in 1990 and control was transferred to [[Westbury PSB]]. | |||
No signalman token working on the branch was replaced by track circuit block, and the token machines all removed, including the one on the platform at Chippenham. | |||
[[File: 1990-01.png|border]] |
Latest revision as of 22:24, 15 November 2014
Back to Main Line
Back to Control Area - Description of Routes
Platform Changes
The Down Main was slewed from the original down platform at Chippenham to the island platform in 1976.
Conversion of Melksham Line to TCB
Bradford Junction box closed in 1990 and control was transferred to Westbury PSB.
No signalman token working on the branch was replaced by track circuit block, and the token machines all removed, including the one on the platform at Chippenham.