359: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:


[[File: 1975-04.png | border]]
[[File: 1975-04.png | border]]
==Removal==
The connection was taken out of use altogether in July 1987:
[[File: 1987-02.png | border]]

Revision as of 21:27, 15 November 2014

Back to Control Functions

Relaying and Removal of Spur

The connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur.

1975-04.png

Removal

The connection was taken out of use altogether in July 1987:

1987-02.png