Ashbury Ground Frame: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
The ground frame controlled a facing and a trailing crossover. It was protected by semi-automatic signals [[DM.70]] and [[UM.71]]. | The ground frame controlled a facing and a trailing crossover. It was protected by semi-automatic signals [[DM.70]] and [[UM.71]]. | ||
It was released by [[Uffington]] signal box from the time | It was released by [[Uffington]] signal box from the time that [[Ashbury]] signal box closed under [[Swindon MAS Stage 1]] on 12 November 1966<ref name="S.2498">[[S.2498]]</ref>. | ||
When Uffington SB closed at control over the release passed to Swindon Panel in [[Swindon MAS Stage 5]]. | |||
<references/> | <references/> |
Revision as of 17:18, 5 August 2014
The ground frame controlled a facing and a trailing crossover. It was protected by semi-automatic signals DM.70 and UM.71.
It was released by Uffington signal box from the time that Ashbury signal box closed under Swindon MAS Stage 1 on 12 November 1966[1].
When Uffington SB closed at control over the release passed to Swindon Panel in Swindon MAS Stage 5.