31/W/2764: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Challow > Wantage Road and location links)
m (Reworded page)
Line 3: Line 3:
[http://www.s-r-s.org.uk/archivesignals/brwr.php External link to 31/W/2764]
[http://www.s-r-s.org.uk/archivesignals/brwr.php External link to 31/W/2764]


This notice describes the introduction of reversible signalling on some lines in the [[Uffington]] Area on 27 July 1980. Signals for running Up the Down Main from [[Bourton]] ([[SN.693]], [[SN.693R]], [[SN.693RR]]), and Down the Up Main from [[Wantage Road]] ([[SN.610]], [[SN.610R]]), are introduced, as are points [[SN.304]] at Uffington.
This notice describes the introduction of reversible signalling Up the Down Main from [[Bourton]] to [[Uffington]], and Down the Up Main from [[Wantage Road]] to Uffington, on 27 July 1980. Signals for running Up the Down Main from ([[SN.693]], [[SN.693R]], [[SN.693RR]]), and Down the Up Main ([[SN.610]], [[SN.610R]]), are introduced, as are points [[SN.304]] at Uffington.

Revision as of 09:58, 9 June 2014

Back to list of Sources - Signalling Notices.

External link to 31/W/2764

This notice describes the introduction of reversible signalling Up the Down Main from Bourton to Uffington, and Down the Up Main from Wantage Road to Uffington, on 27 July 1980. Signals for running Up the Down Main from (SN.693, SN.693R, SN.693RR), and Down the Up Main (SN.610, SN.610R), are introduced, as are points SN.304 at Uffington.