Bourton
Jump to navigation
Jump to search
There are emergency crossovers at Bourton for the facilitation of Reversible Working (east to Uffington, west to Swindon East).
Interlocking
The interlocking at Bourton was commissioned on 1/10/77. The K2 refers:
SN.683R was converted from a 2-aspect (yellow/green) head to a 3-aspect (red/yellow/green) head at 0700 on 30 September 2001, although the red aspect was not brought into use.
Further Reading
More photos of Bourton: https://www.flickr.com/photos/swindonpanel/sets/72157645729888124/