31/W/2764: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created 31/W/2764 page)
 
(Challow > Wantage Road and location links)
Line 3: Line 3:
[http://www.s-r-s.org.uk/archivesignals/brwr.php External link to 31/W/2764]
[http://www.s-r-s.org.uk/archivesignals/brwr.php External link to 31/W/2764]


This notice describes the introduction of reversible signalling on some lines in the Uffington Area on 27 July 1980. Signals for running Up the Down Main from Bourton ([[SN.693]], [[SN.693R]], [[SN.693RR]]), and Down the Up Main from Challow ([[SN.610]], [[SN.610R]]), are introduced, as are points [[SN.304]] at Uffington.
This notice describes the introduction of reversible signalling on some lines in the [[Uffington]] Area on 27 July 1980. Signals for running Up the Down Main from [[Bourton]] ([[SN.693]], [[SN.693R]], [[SN.693RR]]), and Down the Up Main from [[Wantage Road]] ([[SN.610]], [[SN.610R]]), are introduced, as are points [[SN.304]] at Uffington.

Revision as of 22:12, 8 June 2014

Back to list of Sources - Signalling Notices.

External link to 31/W/2764

This notice describes the introduction of reversible signalling on some lines in the Uffington Area on 27 July 1980. Signals for running Up the Down Main from Bourton (SN.693, SN.693R, SN.693RR), and Down the Up Main from Wantage Road (SN.610, SN.610R), are introduced, as are points SN.304 at Uffington.