DM.72: Difference between revisions
mNo edit summary |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
|NextSignal=[[DM.73]] | |NextSignal=[[DM.73]] | ||
}} | }} | ||
==Alterations in connection with Reversible Signalling== | |||
From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future conversion to controlled ([[SN.20]]) and installation of [[SN.620]]. | |||
[[File: 1977-03.png|border]] | |||
The reversible signalling was brought into use in 1981 <ref>Signalling Notice [[31/W/2770]]</ref>. | |||
==Conversion to Controlled== | ==Conversion to Controlled== | ||
Line 21: | Line 30: | ||
This number became disused when the signal was converted to a controlled signal, [[SN.20]], when [[Bourton]] Interlocking was commissioned on 1/10/77, as described in the following WON entry: | This number became disused when the signal was converted to a controlled signal, [[SN.20]], when [[Bourton]] Interlocking was commissioned on 1/10/77, as described in the following WON entry: | ||
[[File: | [[File:1977-08.png|border]] | ||
==Reincarnation== | ==Reincarnation== | ||
Line 33: | Line 42: | ||
It was later planned to be brought into use on 11 February 2002, as described in [[GWS.27]]: | It was later planned to be brought into use on 11 February 2002, as described in [[GWS.27]]: | ||
[[File:WON-2002- | [[File:WON-2002-06.png | border]] | ||
and | and |
Latest revision as of 13:14, 15 November 2014
Back to Control Functions.
There have been two DM.72 signals in the lifetime of Swindon Panel.
Origin
DM.72 was originally a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Highworth Junction SB.
Supervision passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
DM.70 | Down Main | Down Main | DM.73 |
Alterations in connection with Reversible Signalling
From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future conversion to controlled (SN.20) and installation of SN.620.
The reversible signalling was brought into use in 1981 [2].
Conversion to Controlled
This number became disused when the signal was converted to a controlled signal, SN.20, when Bourton Interlocking was commissioned on 1/10/77, as described in the following WON entry:
Reincarnation
A new 4-aspect signal, numbered DM.72 was installed later, in connection with the South Marston commissioning.
This was planned to be brought into use on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.
It was later planned to be brought into use on 11 February 2002, as described in GWS.27:
and
but wasn't until 18 February 2002....