Uffington: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Flickr link added)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
The installation of reversible signalling provided trailing (27/7/80<ref>Signalling Notice [[31/W/2766]]</ref>) and (9.2.81<ref>Signalling Notice [[31/W/2769]]</ref>) facing emergency crossovers at Uffington (for working east to Wantage Road (<ref>Signalling Notice [[31/W/2769]]</ref>) and west to Bourton<ref>Signalling Notice [[31/W/2770]]</ref>).  These were the former Uffington Ground Frame worked crossovers provided with points motors with direct control from Swindon Panel and Uffington Ground Frame was abolished with this work.
The installation of reversible signalling provided trailing (27/7/80<ref>Signalling Notice [[31/W/2766]]</ref>) and (9.2.81<ref>Signalling Notice [[31/W/2769]]</ref>) facing emergency crossovers at Uffington (for working east to Wantage Road (<ref>Signalling Notice [[31/W/2769]]</ref>) and west to Bourton<ref>Signalling Notice [[31/W/2770]]</ref>).  These were the former Uffington Ground Frame worked crossovers provided with points motors with direct control from Swindon Panel and Uffington Ground Frame was abolished with this work.


The loops were removed when the 4-track Relief lines were re-laid between Wantage Road and Challow in 1993, leaving the installation as simply the emergency crossovers.
==Spring Points in Loops==
 
The spring points at the entrances to the loops has been the subject of much discussion. For safe keeping, here are two documents relating to that.
 
* [[Media:PI_28.PDF|Principles Instruction 28 - Spring Points at Loops]]
 
* [[Media:A_122.PDF|Technical Instruction 122 - Spring Points at Loops]]
 
 
==Removal of Loops==
 
The loops were removed after the 4-track Relief lines were re-laid between Wantage Road and Challow in 1993, leaving the installation as simply the emergency crossovers.
 
The Up Goods was taken out of use in December 1994:
 
[[File: 1994-01.png|border]]
 
And the Down Goods were removed in September 1996, having already been taken out of use at an unknown date:
 
[[File: 1996-01.png | border]]


==Station==
==Station==

Latest revision as of 21:21, 25 January 2015

Uffington Location Sign
Uffington Panel diagram

Back to Main Line page. | Back to List of Routes

Overview

Uffington was formerly a significant station complex, with a junction for a branch line to Faringdon. The layout was reduced in connection with the introduction of MAS to that of simply main lines, with a goods loop on each side, and a set of facing and trailing crossovers. Crossovers at both Challow and Ashbury, as well as Ashbury Up Siding, were worked by ground frames released by Uffington. Upon takeover of the area by Swindon Panel a ground frame was provided at Uffington to work the crossovers formerly controlled by the box.

The installation of reversible signalling provided trailing (27/7/80[1]) and (9.2.81[2]) facing emergency crossovers at Uffington (for working east to Wantage Road ([3]) and west to Bourton[4]). These were the former Uffington Ground Frame worked crossovers provided with points motors with direct control from Swindon Panel and Uffington Ground Frame was abolished with this work.

Spring Points in Loops

The spring points at the entrances to the loops has been the subject of much discussion. For safe keeping, here are two documents relating to that.


Removal of Loops

The loops were removed after the 4-track Relief lines were re-laid between Wantage Road and Challow in 1993, leaving the installation as simply the emergency crossovers.

The Up Goods was taken out of use in December 1994:

1994-01.png

And the Down Goods were removed in September 1996, having already been taken out of use at an unknown date:

1996-01.png

Station

There was a station at Uffington between 1840 and 1964, closed before the advent of Swindon MAS.

Interlocking

One of Swindon's interlockings is situated at Uffington - a WR E10k freewired relay interlocking - commissioned on 30th May 1965[5] (before the opening of the Panel). It was originally controlled by Uffington Signal Box in connection with ground frame releases for Challow, Ashbury Up Sidings and Ashbury Crossovers, plus emergency replacement switches on signals. It was recontrolled to Swindon Panel when it opened on 3rd March 1968 and the interlocking was extended as part of this recontrol, the local Uffington area having formerly been worked by the lever frame in Uffington box and interlocked mechanically, rather through the relay interlocking [5].

The mapping of some of the signals in the interlocking area from Uffington SB to Swindon PSB is recorded in S.2564:

  • UF.32 -> SN.10 (Down Main, protecting the loop)
  • UF.4 -> SN.12 (Down Loop "exit" signal)
  • UF.22 -> SN.89 (Up Main, protecting the loop)
  • UF.16 -> SN.91 (Up Loop "exit" signal)

The interlocking is operated via a remote control system from Swindon Panel.

The next interlocking to the east was Wantage Road until Swindon B opened, when it became SWDN02 on 13 March 1993[5]. The next interlocking to the west was Highworth Jcn from the opening of the panel in March 1968, until the commissioning of Bourton Interlocking on 01 October 1977.

Overrides

The interlocking was fitted with remote control overrides (through routes) from the opening of the panel, and later with selective overrides. The interlocking was fitted with a local override as well on 10 January 2010.

The through routes and local override operate 'straight up and down' routes: 10B, 89B, 93A.

Selective overrides are available for 610B and 693A, to allow a train to 'escape' the reversibly signalled sections.

Further Reading

More photos of Uffington: http://www.flickr.com/photos/swindonpanel/sets/72157645735978163/

References

  1. Signalling Notice 31/W/2766
  2. Signalling Notice 31/W/2769
  3. Signalling Notice 31/W/2769
  4. Signalling Notice 31/W/2770
  5. 5.0 5.1 5.2 British Power Signalling Register (http://www.bpsr.org.uk)