SN.125: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created page with "Back to Control Functions ==Origin== The signal was brought into use in April 1989 in connection with the installation of reversible signalling between Thingley and ...")
 
No edit summary
 
Line 4: Line 4:


The signal was brought into use in April 1989 in connection with the installation of reversible signalling between [[Thingley]] and [[Bathampton]] Junctions.
The signal was brought into use in April 1989 in connection with the installation of reversible signalling between [[Thingley]] and [[Bathampton]] Junctions.
It was provided with a repeater, [[SN.125R]].
SN.125 is the only reversible signal on the Swindon Panel area to not conform to the pattern of reversible signals being 600 numbers higher than their 'right direction' counterparts.


[[File: 1989-03.png|border]]
[[File: 1989-03.png|border]]

Latest revision as of 21:57, 15 November 2014

Back to Control Functions

Origin

The signal was brought into use in April 1989 in connection with the installation of reversible signalling between Thingley and Bathampton Junctions.

It was provided with a repeater, SN.125R.

SN.125 is the only reversible signal on the Swindon Panel area to not conform to the pattern of reversible signals being 600 numbers higher than their 'right direction' counterparts.