359: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
==Removal==
==Removal==


The connection was taken out of use altogether in July 1987:
The connection was shown as being taken out of use altogether in July 1987:


[[File: 1987-02.png | border]]
[[File: 1987-02.png | border]]
The connection was shown as being recovered in November 1992. Did it really sit out of use for 5 years?
[[File: 1992-03.png | border]]

Latest revision as of 22:40, 15 November 2014

Back to Control Functions

Relaying and Removal of Spur

The connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur.

1975-04.png

Removal

The connection was shown as being taken out of use altogether in July 1987:

1987-02.png

The connection was shown as being recovered in November 1992. Did it really sit out of use for 5 years?

1992-03.png