Purton Common: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
The crossing was closed to road traffic and the signals recovered in 1981:
The crossing was closed to road traffic and the signals recovered in 1981:


[[File: 1981-01.png | border]]
[[File: 1981-03.png | border]]


==Removal of telephone==
==Removal of telephone==


At some point the telephone was removed....
The telephone was removed in December 1996:
 
[[File: 1996-03.png|border]]


==Addition of telephone==
==Addition of telephone==

Latest revision as of 23:12, 15 November 2014

Back to Level Crossings.

Origin

...

Closure to road traffic

The crossing was closed to road traffic and the signals recovered in 1981:

1981-03.png

Removal of telephone

The telephone was removed in December 1996:

1996-03.png

Addition of telephone

Published in the WON for 05-11/10/2002:

WON-2002-08.png