S.2501: Difference between revisions
m (Link back to sources added) |
(Text truncated as moved to Stage 2 page) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Swindon MAS Stage 2 - Wootton Bassett West to Thingley Junction= | |||
Back to list of [[Sources - Signalling Notices]]. | Back to list of [[Sources - Signalling Notices]]. | ||
[[Media:S2501map.jpg|Download S.2501 Map]] | '''[[Media:S2501text.pdf|Download S.2501 Text]]''' | ||
'''[[Media:S2501map.jpg|Download S.2501 Map]]''' | |||
The second stage of the MAS scheme is described in notice S.2501, which had published implementation dates of Saturday 3rd December to Sunday 4th December 1966 and concerned the [[Wootton Bassett]] to [[Thingley]] Junction area. | |||
[[Chippenham]] East and [[Langley]] Crossing Boxes were closed and all the signalling removed. The junction at [[Thingley]] was altered in readiness for MAS with the removal of one of its facing crossovers and replacement with a trailing one (that would eventually form part of the junction with the [[Weymouth Line|Melksham line]] (to be singled). | |||
Continuous Track Circuiting (CTC) was installed a Track Circuit Block (TCB) applied between [[Wootton Bassett]] West and [[Thingley]] Junction. [[Wootton Bassett]] West (working absolute block to East) thence lost its ability to switch out. | |||
[[ | '''Full details in the [[Swindon MAS Stage 2]] page.''' |
Latest revision as of 20:32, 16 July 2014
Swindon MAS Stage 2 - Wootton Bassett West to Thingley Junction
Back to list of Sources - Signalling Notices.
The second stage of the MAS scheme is described in notice S.2501, which had published implementation dates of Saturday 3rd December to Sunday 4th December 1966 and concerned the Wootton Bassett to Thingley Junction area.
Chippenham East and Langley Crossing Boxes were closed and all the signalling removed. The junction at Thingley was altered in readiness for MAS with the removal of one of its facing crossovers and replacement with a trailing one (that would eventually form part of the junction with the Melksham line (to be singled).
Continuous Track Circuiting (CTC) was installed a Track Circuit Block (TCB) applied between Wootton Bassett West and Thingley Junction. Wootton Bassett West (working absolute block to East) thence lost its ability to switch out.
Full details in the Swindon MAS Stage 2 page.