UM.72: Difference between revisions
(Number of aspects added) |
No edit summary |
||
Line 6: | Line 6: | ||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | ||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.73]] | |||
|LastSignalLine=Up Main | |||
|NextSignalLine=Up Main | |||
|NextSignal=[[UM.61]] | |||
}} | |||
==Conversion to Automatic== | ==Conversion to Automatic== |
Revision as of 17:51, 5 August 2014
Back to Control Functions.
Origin
UM.72 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.73 | Up Main | Up Main | UM.61 |
Conversion to Automatic
This signal was planned to be "converted to an automatic" (from what?) on 2 August 1970:
But the work did not take place as planned:
and the signal was actually converted to automatic on 6 September of that year.
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...
Conversion to Controlled
This signal was taken out of use when Bourton Interlocking was commissioned on 1/10/77, as described in the following WON entry:
The signal became a controlled signal - SN.83