SN.225: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 8: Line 8:


[[File: 1975-04.png | border]]
[[File: 1975-04.png | border]]
==Removal==
The signal was taken out of use when the connection ([[359]] points) was taken out of use in July 1987:
[[File: 1987-02.png | border]]
It was not shown as recovered until November 1992:
[[File: 1992-03.png | border]]

Latest revision as of 22:41, 15 November 2014

Back to Control Functions

Relaying and Removal of Spur

359 connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur at this time.

1975-04.png

Removal

The signal was taken out of use when the connection (359 points) was taken out of use in July 1987:

1987-02.png

It was not shown as recovered until November 1992:

1992-03.png