Relaying and Removal of Spur
359 connection was relayed in July 1975. The spur was removed.
SN.225 lost its route to the spur at this time.
Removal
The signal was taken out of use when the connection (359 points) was taken out of use in July 1987:
It was not shown as recovered until November 1992: