SN.125R: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Back to Control Functions ==Origin== The signal was brought into use in April 1989 in connection with the installation of reversible signalling between Thingley and ...") |
(No difference)
|
Latest revision as of 21:56, 15 November 2014
Back to Control Functions
Origin
The signal was brought into use in April 1989 in connection with the installation of reversible signalling between Thingley and Bathampton Junctions.
It repeats SN.125.
