SN.125: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created page with "Back to Control Functions ==Origin== The signal was brought into use in April 1989 in connection with the installation of reversible signalling between Thingley and ...")
(No difference)

Revision as of 21:56, 15 November 2014

Back to Control Functions

Origin

The signal was brought into use in April 1989 in connection with the installation of reversible signalling between Thingley and Bathampton Junctions.

1989-03.png