SN.225: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
[[File: 1975-04.png | border]] | [[File: 1975-04.png | border]] | ||
==Removal== | |||
The signal was taken out of use when the connection ([[359]] points) was taken out of use in July 1987: | |||
[[File: 1987-02.png | border]] |
Revision as of 21:32, 15 November 2014
Back to Control Functions
Relaying and Removal of Spur
359 connection was relayed in July 1975. The spur was removed.
SN.225 lost its route to the spur at this time.
Removal
The signal was taken out of use when the connection (359 points) was taken out of use in July 1987: