UM.72: Difference between revisions
(Origin added) |
|||
(9 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
==Origin== | ==Origin== | ||
UM.72 was | UM.72 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | ||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.73]] | |||
|LastSignalLine=Up Main | |||
|NextSignalLine=Up Main | |||
|NextSignal=[[UM.61]] | |||
}} | |||
==Conversion to Automatic== | ==Conversion to Automatic== | ||
Line 20: | Line 27: | ||
The signal is shown as already an automatic in the resignalling notice [[S.2498]], so unknown what it was converted to an automatic from... | The signal is shown as already an automatic in the resignalling notice [[S.2498]], so unknown what it was converted to an automatic from... | ||
==Alterations in connection with Reversible Signalling== | |||
From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future conversion to controlled ([[SN.83]]) and installation of [[SN.683]]. | |||
[[File: 1977-03.png|border]] | |||
The reversible signalling was brought into use in 1981 <ref>Signalling Notice [[31/W/2773]]</ref>. | |||
==Conversion to Controlled== | ==Conversion to Controlled== | ||
Line 25: | Line 40: | ||
This signal was taken out of use when [[Bourton]] Interlocking was commissioned on 1/10/77, as described in the following WON entry: | This signal was taken out of use when [[Bourton]] Interlocking was commissioned on 1/10/77, as described in the following WON entry: | ||
[[File: | [[File:1977-08.png|border]] | ||
The signal became a controlled signal - [[SN.83]] | The signal became a controlled signal - [[SN.83]] | ||
==References== | |||
<references /> |
Latest revision as of 13:13, 15 November 2014
Back to Control Functions.
Origin
UM.72 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.73 | Up Main | Up Main | UM.61 |
Conversion to Automatic
This signal was planned to be "converted to an automatic" (from what?) on 2 August 1970:
But the work did not take place as planned:
and the signal was actually converted to automatic on 6 September of that year.
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...
Alterations in connection with Reversible Signalling
From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future conversion to controlled (SN.83) and installation of SN.683.
The reversible signalling was brought into use in 1981 [2].
Conversion to Controlled
This signal was taken out of use when Bourton Interlocking was commissioned on 1/10/77, as described in the following WON entry:
The signal became a controlled signal - SN.83