SN.225: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created page with "Back to Control Functions ==Relaying and Removal of Spur== 259 connection was relayed in July 1975. The spur was removed. SN.225 lost its route to the spur at this ...")
 
No edit summary
Line 3: Line 3:
==Relaying and Removal of Spur==
==Relaying and Removal of Spur==


[[259]] connection was relayed in July 1975. The spur was removed.
[[359]] connection was relayed in July 1975. The spur was removed.


SN.225 lost its route to the spur at this time.
SN.225 lost its route to the spur at this time.


[[File: 1975-04.png | border]]
[[File: 1975-04.png | border]]

Revision as of 15:38, 9 November 2014

Back to Control Functions

Relaying and Removal of Spur

359 connection was relayed in July 1975. The spur was removed.

SN.225 lost its route to the spur at this time.

1975-04.png