Operating Instructions

From Swindon Panel Reference
Jump to navigation Jump to search

Brainstorm area for operating instructions notes.


Control Console

Panel Arrangement

  • Main Panel
  • Back Desk
  • Staffing

The panel is staffed by two signalmen and a back desk person.

(From 2005 the panel was staffed by one signalman between 0001 and 0600).

Diagram

  • Explanation of symbols
  • Panel Inidications

Tracks Signals Points

  • Locale

Fringe Boxes Method of block working

  • Setting Routes

Types of routes Red arrow and yellow arrows White route lights Routesetting-system

  • Sectional route release
  • Approach Locking
  • Swinging points
  • Distribution of interlocking

Remote Controls Through Routes

Train Describer

  • Display
  • Stepping
  • Interposing
  • Cancelling
  • Onward Transmission
  • Multi-berth signals


Other equipment

  • HABDs

There are two HABDs on the Swindon Panel area: Bourton (Down Main) and Wootton Bassett / Studley (Up Main).

Alarm and indication equipment separate from the panel indicates when these have been activated at the axles concerned.

  • TRUST

A TRUST computer exists on the back desk to failitate train running enquiries.

  • Teleprinter

A teleprinter, connected to the TRUST terminal, can be used for printing TRUST schedules, and also automatically prints information wires from other offices in the company.

  • ATR

If/when provided ?