SN.70: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 17: Line 17:


==Origins of NEW SN.70==
==Origins of NEW SN.70==
[[File:SN70 SN670.jpg|thumb|450px|right|SN.70, left, and [[SN.670]] (right), with the barrow crossing in the foreground. July 2013]]


[[SN.72R]] was renumbered to SN.70 after 1975.
[[SN.72R]] was renumbered to SN.70 after 1975.

Latest revision as of 00:12, 16 November 2014

Back to Control Functions

[There have been two SN.70s - an early one relating to DM.89 and the later one relating to SN.72R on the end of Chippenham station.]

Conversion from automatic

This signal was made controlled and re-designated from DM.89 in December 1970:

1970-04.png

AWS Fitment

The signal was fitted with an AWS ramp in October 1971.

1971-01.png


Origins of NEW SN.70

SN.70, left, and SN.670 (right), with the barrow crossing in the foreground. July 2013

SN.72R was renumbered to SN.70 after 1975.