SN.70

From Swindon Panel Reference
Jump to navigation Jump to search

Back to Control Functions

[There have been two SN.70s - an early one relating to DM.89 and the later one relating to SN.72R on the end of Chippenham station.]

Conversion from automatic

This signal was made controlled and re-designated from DM.89 in December 1970:

1970-04.png

AWS Fitment

The signal was fitted with an AWS ramp in October 1971.

1971-01.png


Origins of NEW SN.70

SN.70, left, and SN.670 (right), with the barrow crossing in the foreground. July 2013

SN.72R was renumbered to SN.70 after 1975.