Research Guidance - Interlockings

From Swindon Panel Reference
Revision as of 22:45, 21 May 2014 by Danny (talk | contribs) (Protected "Research Guidance - Interlockings" (‎[edit=sysop] (indefinite) ‎[move=sysop] (indefinite)))
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Research Guidance.

Articles about Interlockings should aim to include as much of the following as possible:

The top of the page should have a link back to the list of Interlockings.

  • Description of the location (miles and chains)
  • Description of the track layout controlled
  • Type of interlocking
  • Method of control
  • Date commissioned
  • Date controlled onto Swindon Panel (if the interlocking pre-dates the panel)
  • Date taken out of use
  • (If dates not available, then dates known to be in existence, or not in existence)