SN.24

From Swindon Panel Reference
Jump to navigation Jump to search

Back to Control Functions

Movement onto gantry

The signal was moved onto a gantry (in preparation for the installation of SN.624) in March 1976:

1976-06.png

Alterations to Profile

In May 1976 the signal was fitted with a number 1 junction indicator for routes towards the (new) Down Goods. The stencil box that formerly gave this information was removed.

1976-08.png

Capability to flash single yellow

The signal was given the capability to flash single yellow in May 1988, when the next signal, SN.28, was cleared towards platform 3.

1988-01.png