Christian Malford Ground Frame

From Swindon Panel Reference
Revision as of 02:22, 7 January 2017 by Danny (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions | Back to list of Ground Frames

This GF was installed under Stage 2 of the Swindon MAS scheme on 4th December 1966.

It controlled a trailing crossover between the main lines and was protected by DM.89 and UM.90 (semi-automatic).