Christian Malford Ground Frame
Jump to navigation
Jump to search
This GF was installed under Stage 2 of the Swindon MAS scheme on 4th December 1966.
It controlled a trailing crossover between the main lines and was protected by DM.89 and UM.90 (semi-automatic).