Knighton
Jump to navigation
Jump to search
Signal Box
The mechanical signal box at Knighton was taken out of use preliminary to Swindon MAS Stage 1, between 0700 and 0800 on Saturday 12 November 1966[1].
Level Crossing
The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].
The crossing was closed with the raising of the line speed at the time of the introduction of HST.