Ashbury

From Swindon Panel Reference
Revision as of 16:40, 5 August 2014 by Danny (talk | contribs)
Jump to navigation Jump to search

Signal Box

The mechanical signal box at Ashbury was taken out of use under Swindon MAS Stage 1, 12 November 1966[1].

Level Crossing

The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].

The crossing was closed with the raising of the line speed at the time of the introduction of HST.

  1. 1.0 1.1 S.2498