Ashbury

From Swindon Panel Reference
Revision as of 16:40, 5 August 2014 by Danny (talk | contribs) (Addition of signal box information)
Jump to navigation Jump to search

Signal Box

The mechanical signal box at Ashbury was taken out of use under Swindon MAS Stage 1, 12 November 1966[1].

Level Crossing

The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[2].

The crossing was closed with the raising of the line speed at the time of the introduction of HST.