S.2503

From Swindon Panel Reference
Revision as of 20:35, 16 July 2014 by Danny (talk | contribs) (Text truncated as moved to Stage 3 page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Swindon MAS Stage 3 - Thingley Junction to Bathampton and Bradford Junction

Back to list of Sources - Signalling Notices.

Download S.2503 Text

Download S.2503 Map

The third stage of the MAS scheme concerns the Chippenham to Bathampton and Bradford Junction area, and is described in notice S.2503, planned to be implemented Saturday 25th February to Sunday 26th February 1967 on the main lines and from Sunday 26th February to Monday 27th February on the branch lines.

Full details in the Swindon MAS Stage 3 page.