No. 64

From Swindon Panel Reference
Revision as of 11:12, 9 June 2014 by Daniel Evans (talk | contribs) (Creation of Notice No.64 page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to list of Sources - Signalling Notices.

External link to Notice No. 64

This notice describes the first stage of the opening of Swindon "B" SCC. Three signals controlled by Swindon PSB in the Uffington Interlocking area are replaced/re-sited and transferred to SB, specifically UM.65 (SB.1014), DM.63 (SB.107), and DM.64 (SB.1011, moved to approx. 64m 51ch). In the Reading PSB area, UM.63 becomes SB.1010.

Challow Down Relief is opened, and changes occur to the reversible signalling for running Up the Down Main. Two new signals are introduced, SB.1008R (co-located with UM.65/SB.1014) and SB.1008 (co-located with UM.63/SB.1010), and SN.91, SN.93 and SN.693 now route to these signals, replacing the routes to R.703/R.703R.

SN.610R is re-sited to approx. 64m 51ch, and a new signal, SN.610RR, is introduced at approx. 63m 50ch.