S.2527
Signal Alterations at Swindon East
Back to list of Sources - Signalling Notices.
External link to SRS page with document available
No. 1 Up Siding taken OOU. Spring point on Down Engine Line removed. Up Engine Line extended to join No. 2 Up Siding, new spring point leading to Down Engine Line provided. Up and Down Engine Lines renamed Up and Down Through Sidings. New Up Branch Home provided, replacing existing Up Branch Home Bracket. Up Engine Line bracket removed. Up Goods Loop-No. 1 Siding and Up Branch-Up Goods Loop points clipped. Various stop board erected as per diagram.