Down Yard Ground Frame
Jump to navigation
Jump to search
Back to Control Functions | Back to list of Ground Frames
Origin
The ground frame was provided when control was required over the (existing) connection from the Down Yard into the Down Reception, when the latter lines was converted to a Down Goods and signalled between 1 and 8 May 1976[1]
Other notes
K2 entry for safe-keeping: