331

From Swindon Panel Reference
Revision as of 02:13, 7 January 2017 by Danny (talk | contribs)
Jump to navigation Jump to search

Back to Control Functions | Back to list of Ground Frames

P-way Alterations

The single-slip in the Up Main was replaced with two separate point ends in 1971:

1971-02.png

Removal

The connection was shown as being recovered in December 1992:

1992-05.png