Origin

...

Alterations in connection with Reversible Signalling

From 6 November 1977 the signal was mounted on a new gantry, in readiness for the future installation of SN.653R and DM.79 on the same structure.

1977-10.png

The reversible signalling was brought into use in 1980 [1].

Capability to flash double yellow

The signal was given the capability to flash double yellow in May 1988, when the next signal, SN.53, was showing a flashing single yellow, and the following signal SN.59, was cleared towards platform 3 or platform 1.

1988-01.png

References

  1. Signalling Notice 31/2767