DM.81
Jump to navigation
Jump to search
Back to Control Functions
Origin
The signal was brought into use in December 1977.
[The WON entry shows that the signal replacing SN.60, but as SN.60 had a different number and a different position, this is being treated as a separate signal.]
The signal was given the capability to flash single yellow when the next signal, SN.62, was displaying proceed with the route set towards the Down Badminton, in May 1979.