SN.653
Revision as of 14:06, 15 November 2014 by Danny (talk | contribs) (Created page with "Back to Control Functions ==Origin== The signal was brought into use over the weekend 3-5 May 1977, replacing ground position light signal SN.209 as part of the prep...")
Back to Control Functions
Origin
The signal was brought into use over the weekend 3-5 May 1977, replacing ground position light signal SN.209 as part of the preparation for the commissioning of reversible signalling.
SN.653 was fixed at red initially.
The reversible signalling was brought into use in 1980 [1].