SN.209

From Swindon Panel Reference
Revision as of 14:05, 15 November 2014 by Danny (talk | contribs) (Created page with "Back to Control Functions ==Origin== ... ==Replacement== Over the weekend 3-5 May 1977 the signal was replaced by new main aspect signal SN.653 as part of the prep...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions

Origin

...

Replacement

Over the weekend 3-5 May 1977 the signal was replaced by new main aspect signal SN.653 as part of the preparation for the commissioning of reversible signalling.

1977-11.png