Down Sidings Ground Frame

From Swindon Panel Reference
Revision as of 22:35, 24 August 2014 by Danny (talk | contribs) (Created)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Description

The ground frame worked 346 points, the trailing connection in the Down Goods from the Down Through Siding at Swindon West.

The ground frame was mechanical throughout its life.

Abolition

The ground frame was abolished when the points were removed, after a long period of disuse, from 05.15 on Monday 12 December 2011:

WON-2011-01.png